Sample – Request for Proposal (RFP) Considerations
October 10, 2012Request for Proposal (RFP) Guideline considerations
|
Technical |
Technical |
| Backup and Recovery | Network |
| Batch File Processing | On-Call Support |
| Change Control of the System – Analysis, Prioritization, Reporting, Planning, Implementation, Verification, Release | On-Site County Support |
| Code Inspections, Design Reviews and Test Reviews | Operating Environment, Procedures |
| Configuration Management (hardware and software) | Performance And Capacity Planning |
| County Access to Data | Phased Implementation |
| Customer Service | Pilot Implementation and Evaluation |
| Data Center Supported Platforms | Production Control Support |
| Data Collection/Distribution Timeframes | Proposed Technical Architecture |
| Data Confidentiality | Release Management |
| Database – Architecture, Modeling Methodology, Normalization, Mirroring | Requirements Traceability |
| Detailed System Design | Response Times |
| Development, Design, Coding and Testing Standards | Service Level Objectives/Agreement |
| Development, Test And Training Environments | Software Distribution |
| Electronic Media Support | Standard Programming Languages |
| Equipment Substitution | Structured Coding |
| Fiscal Reporting | Support Tools |
| General System Design | Supported Versions |
| GUI and On-Line Help | System Acceptance Test and Acceptance Decision |
| Hardware-Software Equipment List | System Availability |
| Hardware-Software Installation | System Innovation |
| Help Desk – Levels, Reporting, Documentation, Response Times, Tools, Training | System Monitoring / Performance Monitoring |
| Independent Audit and Certification | System Security (Physical and Data Security) |
| Interfaces with Existing Systems | System User Support |
| Interoperability | Testing – Phases, Tools, Data, Documentation, Reviews; Interface, Stress, Performance, Regression, Pilot, System, User Acceptance Testing |
| Joint Application Development sessions (JADs), Joint Requirements Planning session (JRPs), and Subject Matter Experts (SMEs) | Transition to a Data Center |
| LAN Administration | Validity Checks and Edit Standards |
| Maintenance – Preventative, Remedial, Routine, Minor Maintenance and Quick Fixes, Technical Refresh | Version Control Process |
| Move, Add Change (MAC) Management | Warranty And Correction |