Sample Project Tasls.

Task

Responsible
Person

Project initiation  
Draft project proposal  
Approve project  
Develop project plan  
Collect information from different anticipated users on network requirements  
Specify network requirements  
Approve network requirements  
Specify network components: hardware, software  
Develop network infrastructure plan  
Develop network quality plan  
Develop SOPs for installation and testing  
Develop SOPs for configuration management and change control  
Develop risk analysis and assessment  
Develop network drawings  
Select equipment and vendors for computers, NOS, network devices  
Order network devices  
Get information on environmental specifications and other from the vendor  
Develop an installation plan  
Prepare locations for the installations  
Prepare locations for the installations  
Install the network components  
Perform IQ tests and document the baseline  
Test connectivity to other network components  
Make a back-up of system configuration  
Develop qualification report  
Audit qualification report  
Approve qualification report  
Prepare locations for the installations  
Prepare locations for the installations  
Install the network components  
Perform IQ tests and document the baseline  
Test connectivity to other network components  
Make a back-up of system configuration  
Develop qualification report  
Audit qualification report  
Approve qualification report  
Develop project plan for the system  
Develop system requirement specifications (SRS)  
Review system requirement specifications with anticipated users  
Approve requirement specifications  
Develop risk analysis and assessment  
Develop functional test plan  
Approve functional test plan  
Develop test traceability matrix  
Develop templates for functional testing  
Develop installation procedure  
Test installation procedure  
Develop tests for on-going use  
Perform functional testing in test environment  
Train users  
Perform functional testing in production environment  
Check test procedures for on-going use  
Approve functional test protocols  
Develop validation report  
Audit project documentation  
Approve project and implementation  
Enter new spreadsheet in data base